Documentation is developed for carrying out work on board:
- for installation of thermal insulation;
- for mounting of a metal lattice on the deck of a twindeck and a platform of 3800 mm from the BL;
- for installation of a cooler enclosure and a refrigeration unit;
- for connection of the refrigeration unit;
- for electrical connection of the refrigeration unit.