Modernization of the ship. Re-equipment of the foremast, 1st mainmast. Replacement of the main engines.
Our company has designed technical and detailed documentation for the modernization of the ship:
Replacement of the main engines
Main engines 8 NVD 48A-2U with a capacity of 736 kW replaced with the newest engines MaK 6M20C with a capacity 1140 kW; were installed the new reduction gear REINTJES WAF 843.